北门(现鲍德温)
北门小学替换项目
学校更名为詹姆斯·鲍德温小学
The existing school building has been replaced with a new school building with a new name on the same site.
詹姆斯鲍德温小学 opened for students on September 6, 2023.
请注意
Seattle Public Utilities will be working on a Natural Drainage System (NDS) along NW 120th Street and NW 117th Street around 詹姆斯·鲍德温 小学.
If you have questions regarding this work, please contact Seattle Public Utilities. 更多信息可在 城市的网站.
开业庆典
A ribbon-cutting ceremony marked the opening of the new school on Aug. 31, 2023. 读故事.
活动照片如下.
最近的进展
进度更新公布了前一个月
2024年1月的主要活动
- 继续玩院子里的交通花园条纹.
- Completed installation of play structures in lower play yard, with PreK play equipment scheduled for installation the week of mid-winter break.
主要活动计划于2024年2月进行
- 完成PreK游戏结构安装.
- 完成调试.
- 完成游戏庭院交通花园剥离.
项目的照片
项目简介
The new two-story elementary school building will provide the spaces and resources that students need for academic success. 大约95,000 square foot school will meet the district’s elementary educational specifications and provide space for up to 650 students. A collaborative process resulted in a building designed to fit into the neighborhood. It will provide outdoor learning, play, and recreation areas.
这所新学校旨在提供公平的教育, 安全, and inspiring learning environment for the entire school community. Learning clusters will have classrooms surrounding learning commons.
可持续设计及建造
符合SPS的清洁能源目标, operation of the new school will not require any fossil fuels. 除了, 屋顶的设计是为了容纳太阳能电池板, which could offset 80% of the building’s energy use in the future.
减少能源使用的特点:
- 地热供暖系统
- Highly efficient ventilation that recovers heat before air leaves the school
- 节能LED照明
- 高度隔热的墙壁和屋顶
- 高性能玻璃纤维窗户
其他可持续设计策略:
- 雨水管理与雨水花园
- 本地抗旱植物
- 屏蔽现场照明,减少光污染
- 拆迁和建筑碎片分类和回收
预计能源使用指数: 17.3
设计公司: 南京汽车架构
总承包商/施工管理: 此施工
项目预算: $90.3M
资金来源: Funded by the Building Excellence V (BEX V) Capital Levy, approved by Seattle voters in 2019.
学校设计顾问小组: 了解学校设计顾问团队(SDAT)的流程 阅读会议记录.